Earth Work

Infrastructure / Roads

Client : MEUNICIPAL DEVELOPMENT AND LENDING FUND ( MDLF )

Funded by : WORLD BANK – AFD – EU

Supervisor : J.V ( ANTEA GROUP , ENGECON , EMCC )

  • From : 2016

  • To : 2018

  • Region : SOUTH GAZA ( AL FUKHARY )

  • Value (USD) : € 8,285,251.44

Project Photos

Description

Project Description
Sofa Sanitary Landfill with 235,000 m 2 Area, is one of the most strategic Projects in Gaza
Strip This project regards the construction of Sofa landfill located at Al Fukhary to serve
the population of the South and Central areas of the Gaza Strip
Project elements included:
 Entrance area including weighbridge and control room,
 Gate and fence,
 Building (190m² on 3 levels, 570 m 3 ) for operation personnel and for Khan Younis Joint Services
Council (KY JSC),
 Workshop (528 m²),
 Composting slab and fencing (930 m²),
 Biogas treatment slab and fencing (300 m²),
 Peripheral road (length 1 735 m),
 Rain water drainage and storage pond (10 531 m 3  capacity , 13 970 m 3  excavation)
 Fencing of the existing solid waste dump site,
 Construction of cell 1, divided in cell 1A and 1B, including:

 Excavation up to 20 m below natural ground level, cut/fill ~ 1 400 000 m 3
 Access ramp to the bottom of the cell,
 Supply and installation of HDPE liner for the bottom and top (sealing
complex): ~ 100 000 m²
Bottom: ~ 60 000 m²
Slopes: ~ 40 000 m²,

 Supply and installation of leachate drainage and collection system,
 Supply and installation of sump pumping system for the leachate
 Infrastructure connections to the limit of the site (water line, transformer, electricity line and
communications),

 High and low current electrical network for the site (lighting, leachate treatment & biogas flare
power supply)
 Leachate pretreatment (aeration lagoon, usable volume 3 000 m 3 ), including supply and
installation         of aeration equipment (2 floating turbines, 7.5kW each):
 Excavation to 2.75 m below natural ground level, cut ~ 4 200 m 3
 Supply and installation of HDPE liner (sealing complex): ~ 3 000 m²

 Pre-fabricated lift station (2 pumps 4 kW each) to transfer the pretreated leachate to the
wastewater treatment plant (distance ~ 800 m).