Maintenance and rehabilitation of pressure line No. (05) in Gaza City
-
CategoryEmergency
-
Clientالهيئة العربية للاعمار
-
Supervisorالهيئة العربية للاعمار
-
Funded By-
-
RegionSouthern Governorate
-
From - To2024-12-09 - 2025-01-09
-
Value54,998.00$
Supply & install 250 mm diameter with total length 80 meter and pipe 160 mm with total length 30 meter, to replace a damage pipe in addition to 100-meter pipe DN 110mm FOR WATER LINE during the conflict