  4. C4 – Buriej WWTP and Sheikh Ajleen WWTP Solar PV Plants (4.7 MWp)

C4 – Buriej WWTP and Sheikh Ajleen WWTP Solar PV Plants (4.7 MWp)

C4 – Buriej WWTP and Sheikh Ajleen WWTP Solar PV Plants (4.7 MWp)

Key facts

Installed capacity
4.7 MWp: Buriej 3,544 kWp DC / 3,000 kWac; Sheikh Ajleen 1,200 kWp
Modules / inverters
Risen 375 Wp monocrystalline modules; 67 Huawei 60 kW string inverters (50 + 17)
Grid connection
22 kV; hybrid with the GEDCO grid, diesel and biogas generators via fuel-save controllers
Scope
Civil works, procurement, E&M installation and commissioning; 3-year O&M

Two grid-connected, ground-mounted solar PV plants totalling 4.7 MWp at the Buriej (Central Gaza) and Sheikh Ajleen wastewater treatment plants, under Contract 4 of the KfW-funded Gaza Central Wastewater Project for CMWU. Fuel-save controllers synchronise the PV with the GEDCO grid and each site's diesel and biogas generators, cutting the treatment plants' fuel use. MACC carried out the civil works, procurement, E&M installation and commissioning, and operated the plants for three years from August 2020.

Scope of work

  • Civil works for both PV fields: ground-mounted, fixed-tilt steel structures facing south
  • Supply and installation of about 9,450 modules at Buriej and 3,207 modules at Sheikh Ajleen
  • 50 string inverters at Buriej and 17 at Sheikh Ajleen
  • Step-up transformers and 22 kV grid interconnection
  • Synchronisation with the GEDCO grid, diesel generators and biogas generators
  • Module cleaning system, weather stations and SCADA programming
  • Testing and commissioning
  • Three years of operation and maintenance with annual performance reporting

Technology and key components

  • Risen RSM72-6-375M monocrystalline modules, 375 Wp
  • Huawei SUN2000-60KTL-M0 string inverters, 60 kW each
  • hybrid system of grid-tie inverters with fuel-saving controllers
  • First-year output: 5,938 MWh at Buriej (PR 94.5%) and 2,037 MWh at Sheikh Ajleen (PR 92.2%)