Quality management
MACC runs an integrated management system for quality, environment and occupational health and safety. The system was first certified in 1999 (ISO 9002) and is run to the ISO 9001, ISO 14001 and ISO 45001 standards.
How quality is controlled on every project
- Project quality plan. Before work starts, a quality engineer sets the inspection points for each stage of the job, from planning to handover.
- Materials. Every delivery is inspected against the approved design, specification and samples, and its test certificates are checked.
- Stage inspections and testing. Each main stage of work is inspected, with laboratory testing where required, before the next one begins.
- Programme and resources. Progress reports and site visits every two weeks confirm that work follows the agreed method and programme, with the staff and plant it needs.
- Non-conformance. Any deviation from specification, sequence or programme is recorded at once and followed through to corrective action.
- Final verification. MACC carries out its own full inspection of the finished works before asking the client’s committee to take over.
The quality management representative reports to the General Manager.