إعادة تأهيل و صيانة محطة ضخ رقم 3

  • Category
    محطات الضخ , التحكم عن بعد
  • Client
    مصلحة مياه بلديات الساحل
  • Supervisor
    مجموعة دورش
  • Funded By
    بنك الائتمان لإعادة التنمية KfW
  • Region
    Gaza City
  • From - To
    2015-09-01 00:00:00 - 2019-06-01 00:00:00
  • Value
    900,000.00$

The project is implemented for two sewage Pump Stations PS2 & PS3 in GAZ.A City as Rehabilitation and Fully Reinstallation works

Pumping Station 2

The scope of work is to supply spare part of the following Item

  • Lifting equipment - supply and installation
  • Ventilation - supply and installation
  • Screens
  • Standby generator 250 KVA
  • Mechanical spare parts
  • Electrical spare parts including supply and installation of PLC

 

Pumping Station 3

The scope of work is to dismantle, supply, install and commissioning the following

  • lowing item
  • Screen
  • Dry well submersible pumps
  • Valves & piping
  • Ventilation system
  • Lifting equipment
  • Flow measurement
  • Instrumentation & control equipment
  • Electrical control panel
  • Electrical cabling
  • Standby generator
  • Fire extinguishers
  • Civil engineering materials and metalwork