Key facts
- Pumping capacity
- PS3: new dry-well submersible pumps
- Controls
- PLC (PS2); instrumentation, control equipment and control panel (PS3)
- Works
- Rehabilitation of sewage pumping stations PS2 and PS3
Rehabilitation of sewage pumping stations PS2 and PS3 in Gaza City under the KfW-funded Gaza Central Wastewater Project (ER7.4), for the Coastal Municipalities Water Utility (CMWU). PS2 was refurbished with new lifting, ventilation, screens, a standby generator and spare parts including a new PLC; PS3's equipment was dismantled and replaced. The works were completed in 2018.
Scope of work
- PS2: supply and installation of lifting equipment and ventilation
- PS2: screens and standby generator
- PS2: mechanical and electrical spare parts, including supply and installation of a PLC
- PS3: dismantling and replacement of the screen, dry-well submersible pumps, valves and piping
- PS3: ventilation, lifting equipment and flow measurement
- PS3: instrumentation and control equipment, electrical control panel and cabling
- PS3: standby generator and fire extinguishers
- PS3: civil engineering materials and metalwork