ER7.4 – Pump Stations 2 and 3 Rehabilitation

Key facts

Pumping capacity
PS3: new dry-well submersible pumps
Controls
PLC (PS2); instrumentation, control equipment and control panel (PS3)
Works
Rehabilitation of sewage pumping stations PS2 and PS3

Rehabilitation of sewage pumping stations PS2 and PS3 in Gaza City under the KfW-funded Gaza Central Wastewater Project (ER7.4), for the Coastal Municipalities Water Utility (CMWU). PS2 was refurbished with new lifting, ventilation, screens, a standby generator and spare parts including a new PLC; PS3's equipment was dismantled and replaced. The works were completed in 2018.

Scope of work

  • PS2: supply and installation of lifting equipment and ventilation
  • PS2: screens and standby generator
  • PS2: mechanical and electrical spare parts, including supply and installation of a PLC
  • PS3: dismantling and replacement of the screen, dry-well submersible pumps, valves and piping
  • PS3: ventilation, lifting equipment and flow measurement
  • PS3: instrumentation and control equipment, electrical control panel and cabling
  • PS3: standby generator and fire extinguishers
  • PS3: civil engineering materials and metalwork