Key facts
- Storage
- Four reinforced-concrete reservoirs totalling 25,000 m³, plus an 8,000 m³ tank at the main pumping station
- Pumping capacity
- Main pumping station 1,700 m³/h
- Controls
- SCADA with more than 20,000 signals; fibre-optic links between sites
Contract Package 1b (PWA/KF/2021/020-CTD) of the Gaza Central Desalination Plant and Associated Works, Phase 1, funded by the Kuwait Fund for Arab Economic Development for the Palestinian Water Authority. The package builds the pumping stations and reservoirs of the Southern Main Carrier that will move desalinated water to the southern governorates: a main pumping station, booster station S-01 in Rafah and four reservoirs in Al Qarara, Khan Younis and Rafah. MACC is executing the works.
Scope of work
- Main pumping station of 1,700 m³/h with an 8,000 m³ water tank and related structures
- Booster pumping station S-01 in Rafah
- Four rectangular reinforced-concrete reservoirs totalling 25,000 m³: ST-009 (Al Qarara), ST-011 (Khan Younis), ST-015A and ST-015B (Rafah), with HDPE feeder lines
- Electromechanical works at all sites, including power-supply and ATS buildings
- Fibre-optic connection between the facilities
- SCADA system of more than 20,000 signals, designed to integrate the new sites with existing reservoirs and wells