Project
SGDP Phase 1 – STLV Seawater Desalination Plant for the Southern Governorates (6,000 m³/day)
Client
United Nations Children's Fund (UNICEF)
Funded by
European Union
Capacity
6,000 m³/day
Milestone
Opening ceremony

An opening ceremony was held for the 6,000 m³/day Short Term Low Volume seawater desalination plant in Deir Al Balah, designed and built by MACC for UNICEF with European Union funding.

An opening ceremony was held for the Short Term Low Volume (STLV) seawater desalination plant for the southern governorates of the Gaza Strip in Deir Al Balah. MACC designed and built the plant for UNICEF (contract 43170353) with European Union funding, as part of a Palestinian Water Authority programme.

The plant is Phase 1 of the Southern Gaza Desalination Plant. It produces 6,000 m³/day by single-pass seawater reverse osmosis, with four beach wells (three duty, one standby), sand and cartridge filtration, ERI energy-recovery devices and a grid connection with standby generators. Its product water is blended with groundwater for supply in the southern governorates, and the plant was the largest seawater desalination plant in the Gaza Strip when it opened.

MACC later expanded the plant to 20,000 m³/day under the second-phase expansion of the Southern Gaza Desalination Plant.