Key facts
- Capacity
- Phase II aims to raise the plant to 20,000 m³/day
- Treatment process
- Trickling bio-towers with sessile media
- Scope
- Design–build of Part A of Phase II
Part A of Phase II of the Rafah Wastewater Treatment Plant in the Tal Al Sultan area, built to relieve the overloaded plant and raise its capacity towards 20,000 m³/day. Under an agreement with the ICRC, MACC designed and built two trickling bio-towers with their feed pumping station, internal piping, a redistribution chamber and a bypass chamber, with CMWU as beneficiary and site supervisor. Parts B and C (effluent pumping station and buildings; force main) were separate contracts.
Scope of work
- Design of the Part A works
- Two trickling bio-towers with sessile media
- New feed pumping station for the bio-towers with discharge manifold and electrical works
- New circulation (redistribution) chamber and an additional bypass chamber
- Internal UPVC piping (2 × 400 mm) from the feed pumping station to the bio-towers, the chambers and the new effluent pumping station
- Cabling and electrical control panels
Technology and key components
- Two bio-towers, 16 m diameter and 5 m high, holding 2,000 m³ of sessile media
- Feed pumping station 6.7 m × 5.75 m, 5.1 m total depth, pumping against 11 m head
- Circulation chamber 3.5 m × 4.0 m × 3.25 m deep; bypass chamber 5.15 m × 2.7 m × 2.26 m deep