Rafah Wastewater Treatment Plant – Phase II, Part A

Rafah Wastewater Treatment Plant – Phase II, Part A

Key facts

Capacity
Phase II aims to raise the plant to 20,000 m³/day
Treatment process
Trickling bio-towers with sessile media
Scope
Design–build of Part A of Phase II

Part A of Phase II of the Rafah Wastewater Treatment Plant in the Tal Al Sultan area, built to relieve the overloaded plant and raise its capacity towards 20,000 m³/day. Under an agreement with the ICRC, MACC designed and built two trickling bio-towers with their feed pumping station, internal piping, a redistribution chamber and a bypass chamber, with CMWU as beneficiary and site supervisor. Parts B and C (effluent pumping station and buildings; force main) were separate contracts.

Scope of work

  • Design of the Part A works
  • Two trickling bio-towers with sessile media
  • New feed pumping station for the bio-towers with discharge manifold and electrical works
  • New circulation (redistribution) chamber and an additional bypass chamber
  • Internal UPVC piping (2 × 400 mm) from the feed pumping station to the bio-towers, the chambers and the new effluent pumping station
  • Cabling and electrical control panels

Technology and key components

  • Two bio-towers, 16 m diameter and 5 m high, holding 2,000 m³ of sessile media
  • Feed pumping station 6.7 m × 5.75 m, 5.1 m total depth, pumping against 11 m head
  • Circulation chamber 3.5 m × 4.0 m × 3.25 m deep; bypass chamber 5.15 m × 2.7 m × 2.26 m deep