Key facts

Capacity
Effluent pumping station with four pumps of 350 m³/h each
Structure
Effluent pumping station, administrative building and maintenance shed
Works
Civil, mechanical and electrical works
Scope
Effluent pumping station, administrative building and electrical works

Part B of Phase II of the Rafah Wastewater Treatment Plant in the Tal Al Sultan area, funded by the ICRC for CMWU. MACC built the plant's new effluent pumping station, with four pumps of 350 m³/h each, together with the administrative building and the associated electrical works. Part B complements Part A (bio-towers and their feed pumping station), which MACC also built, and Part C (force main), let separately.

Scope of work

  • Construction of the new effluent pumping station
  • Supply and installation of four effluent pumps of 350 m³/h each
  • Administrative building for the treatment plant
  • Maintenance shed
  • Electrical works for the pumping station and buildings