Key facts
- Pipe length
- 2,200 m water line; 1,000 m storm-water pipes
- Area
- 19,800 m² asphalt paving; 22,000 m² interlocking pavers; 6,200 m kerbstones
- Works
- Paving, water, storm-water and sewer lines, street lighting and signs
- Locations
- Tal Al Hawa, Al Zaitoon and southern Al Remal, Gaza City
Road development in three Gaza City neighbourhoods, Tal Al Hawa, Al Zaitoon and southern Al Remal, for Gaza Municipality, funded by the Arab Fund for Economic and Social Development through the Islamic Development Bank. Alongside asphalt and interlocking-paver surfacing, the works renewed water, storm-water and sewer lines and added street lighting and traffic signs.
Scope of work
- 19,800 m² of asphalt paving
- 22,000 m² of concrete interlocking pavers
- 6,200 m of kerbstones
- 2,200 m of water supply line
- 1,000 m of concrete storm-water pipes
- 7,900 m of PVC sewer pipes
- Street lighting and traffic signs