Key facts
- Length
- 95 m long, 10 m wide (12 m at the head); about 1,000 m²
- Structure
- Offshore jetty completed with anchors
- Purpose
- Unloading of ships and barges carrying humanitarian food aid
Emergency construction of a jetty on the Middle Area coast of the Gaza Strip for World Central Kitchen's Safina project, the maritime aid corridor from Cyprus, so that ships and barges carrying food aid could be unloaded directly while land crossings were closed. MACC built the 95 m jetty and provided cranes, loaders, crews and fuel for the unloading operations.
Scope of work
- Construction of a 95 m long, 10 m wide offshore jetty (about 1,000 m²), widened to 12 m at the head and completed with anchors
- Maintenance of the jetty, with a loader kept on site
- Cranes for unloading aid, including a Grove mobile crane
- Forklift and wheel loaders for cargo handling
- Labour crews for the unloading operations
- Supply of about 30,600 litres of fuel for the operations