Key facts
- Capacity
- Plant upgrade to 90,000 m³/day
- Treatment process
- Anaerobic ponds and trickling filters
- Scope
- Procurement, shipping and delivery to site of all imported equipment and materials
Under Contract 1 of the Emergency Works Programme for the Sheikh Ajleen (Gaza Central) Wastewater Treatment Plant, MACC procured, shipped, stored and delivered to site all the imported equipment and special materials for the plant upgrade, for CMWU with KfW funding and supervision by Dorsch International Consultants. The supply was let separately from the civil works because of restrictions on goods entering Gaza.
Scope of work
- Procurement and manufacture of all equipment and special materials to be imported for the upgrade
- Shipping, temporary storage outside Gaza, transport into Gaza and delivery to the site stores
- Inlet screens and grit-removal equipment
- Trickling-filter equipment, media and distributors; trickling-filter recycle pumps and portable pumps
- Lagoon desludging equipment, valves and piping
- Instrumentation and control equipment, electrical control panels and cabling
- Standby generator, ventilation equipment, flow measurement, operations equipment and spare parts
- Cement, reinforcing steel, structural steel and roofing materials for the civil works