Key facts

Capacity
Plant upgrade to 90,000 m³/day
Treatment process
Anaerobic ponds and four new trickling filters
Sludge / energy
Sludge holding ponds and drying beds; standby generator building
Scope
Civil and building works, installation, testing and commissioning

Contract 2 of the Emergency Works Programme covered the civil construction, installation and commissioning for the upgrade of the Sheikh Ajleen (Gaza Central) Wastewater Treatment Plant, including four new trickling filters, a new PS1 pumping station and ductile-iron pressure lines from PS2 and PS1 to the plant. New units were built alongside the existing ones so the plant stayed in operation. The works were carried out for CMWU with KfW funding and Dorsch supervision.

Scope of work

  • New inlet chamber, screens, grit-removal channels and distribution chamber
  • Completion of anaerobic pond no. 3 and settling channel no. 2
  • New trickling-filter pumping station and four octagonal trickling filters
  • Two new sludge holding ponds and new sludge drying beds at Sheikh Ajleen and at the Buriej WWTP site
  • New pumping station PS1: wet/dry well with screen chamber, superstructure and switchgear room, surge protection, standby generator building with fuel tank, and service building
  • DCI 600 mm pressure line from PS1 to the WWTP (4,347.64 m) and DCI 500 mm pressure line from PS2 to PS1 (699.51 m)
  • DCI 1000–1400 mm sewers, diversion sewer, inlet manhole and connection to the existing pressure pipeline
  • Bypass at the effluent pumping station for direct discharge to the sea, and upgrading of the existing power supply
  • Earthworks (about 53,500 m³ excavation and 127,600 m³ backfilling) and roads between the facilities
  • Installation, erection and site testing of the equipment supplied under Contract 1

Technology and key components

  • Four octagonal reinforced-concrete trickling filters, each on a 602 m² base, 7 m high, 4,284 m³
  • PS1 pumping station with three pumps (two duty, one standby), ductile-iron manifold, surge protection and manual screens
  • Ductile-iron pressure mains DN500 and DN600 linking PS2, PS1 and the treatment plant