Key facts
- Capacity
- 35,600 m³/day (nominal)
- Treatment process
- Activated sludge with nitrogen removal
- Sludge / energy
- Anaerobic digestion, centrifuge dewatering, biogas cogeneration
- Scope
- Two years of operation and maintenance, with CMWU training
Two years of operation and maintenance of the North Gaza Wastewater Treatment Plant and its nine infiltration basins for the Palestinian Water Authority, delivered by MACC. The contract came into force automatically on completion of the plant on 1 March 2018 and included training and capacity building for CMWU staff, who were to take over operation.
Scope of work
- Operation of the treatment process up to the nominal 35,600 m³/day: inlet works, activated sludge with nitrogen removal, sludge thickening, digestion and dewatering
- Operation of biogas handling and cogeneration
- Operation of the nine infiltration basins receiving the treated effluent
- Preventive and corrective maintenance of mechanical, electrical, instrumentation and control equipment
- Preparation of the Operation & Maintenance Execution Plan for PWA approval
- Training and capacity building of CMWU staff
Technology and key components
- Preliminary treatment: pre-aeration, fine screening, grit and grease removal, flow measurement
- Sludge line: mechanical thickening to about 5% dry solids, anaerobic digestion, centrifuge dewatering to about 25% dry solids, 100-day storage
- Nine infiltration basins with a base area of up to 8 ha and 35,600 m³/day infiltration capacity