NGEST – Supply and Installation of Plant and Equipment, North Gaza WWTP

Key facts

Capacity
35,600 m³/day (ultimate design)
Treatment process
Activated sludge with nitrogen removal
Sludge / energy
Two anaerobic digesters; biogas covering about 60% of plant power demand
Scope
Supply and installation of plant and equipment, with the civil works

The original plant-and-equipment contract for the North Gaza Wastewater Treatment Plant under the World Bank-administered North Gaza Emergency Sewage Treatment (NGEST) project, built to serve Jabalia, Beit Lahia and Beit Hanoun. Between 2010 and 2014 MACC executed the civil works for the treatment units, the buildings, infrastructure and internal roads, and the installation of the electromechanical works. MACC went on to complete and commission the plant under the later works-completion contract.

Scope of work

  • Civil works for all treatment units
  • Buildings, infrastructure and internal roads, and finishing works
  • Installation of electromechanical works
  • Preliminary treatment (pre-aeration, fine screening, grit and grease removal, flow measurement) sized for 2025 flows
  • Primary and secondary (activated sludge) treatment sized for the 2018 Phase 1 flows
  • Sludge thickening, two anaerobic digesters, dewatering, drying and storage, with biogas energy recovery

Technology and key components

  • Activated-sludge secondary treatment with nitrogen removal
  • Two anaerobic digesters (4,800 m³ each) with biogas handling and cogeneration
  • Centrifuge dewatering of sludge and storage for further drying
  • Treated effluent discharged to nine infiltration basins of up to 8 ha in total, recharging the aquifer