1. Home
  2. Projects
  3. Roads and bridges
  4. Wadi Abu Saif Bridge

Wadi Abu Saif Bridge

Key facts

Length
About 40 m, two lanes
Structure
Road bridge spanning Street No. 4, North Gaza
Works
Earthworks, soil improvement, substructure, superstructure, metalwork, asphalt and signs

Construction of the Wadi Abu Saif Bridge in Beit Hanoun, North Gaza, for Beit Hanoun Municipality with funding from the Palestinian National Authority. The two-lane bridge, about 40 m long, spans Street No. 4. MACC's works covered earthworks and soil improvement, the substructure and superstructure, metalwork, and the asphalt road works and traffic signs.

Scope of work

  • Earthworks
  • Soil improvement
  • Bridge substructure
  • Bridge superstructure, about 40 m long with two lanes
  • Metalwork
  • Asphalt road works and traffic signs