Key facts
- Voltage
- 22 kV
- Line length
- 1.4 km
- Works
- Generator, transformer and 22 kV network
- Destination
- STLV seawater desalination plant, 6,000 m³/day (Deir Al Balah)
Power supply and electrical works package (Package 4) for the Short Term Low Volume (STLV) seawater desalination plant of 6,000 m³/day in Deir Al Balah, contracted by UNICEF with European Union funding. MACC installed the generator, transformer and a 1.4 km 22 kV high-voltage network that provide the plant with grid and standby power.
Scope of work
- 1.4 km 22 kV high-voltage network connecting the plant to the grid
- Supply and installation of the transformer
- Supply and installation of the standby generator
- Electrical works providing grid and standby power to the RO plant