Key facts
- Structure
- Control building, transformer and outdoor equipment foundations, cable trenches
- Works
- Civil works and building services for the substation
- Scope
- Earthworks, concrete structures and building services (plumbing, HVAC, fire detection, lighting)
Civil and building works for the Gaza North electrical substation, carried out by MACC for ABB in 2001–2002. MACC built the control building, the transformer and outdoor equipment foundations and the cable trenches, and designed and installed the building services, providing the civil infrastructure for the substation's electrical equipment.
Scope of work
- Construction of the substation control building
- Transformer foundations
- Foundations for outdoor equipment
- Cable trenches and their installation
- Design and installation of plumbing
- Heating, ventilation and air conditioning
- Fire detection, lighting and small power