Gaza Central Water and Wastewater project (Contract 1- Buraij WWTP& Wadi Gaza CPS) with 2 years O&M.

Design/Built WWTP with capacity of 60,000 m3/day and wadi Gaza Central PS with a capacity of 7,000 m3/h. Main works included 2 floor administration building with area of 530 m²/each,400 m² workshop building, 20,988 m² road works, 2 cylindric tanks of 45,000 m³, 1,500 m³ cylindric Gas holder building, 25,000 m³ rectangular storage tanks, 8,000 L.M, piping works & 186,377 Excavation works.

Supplying Al Shifa medical complex and the Turkish Palestinian Friendship hospital with two solar energy systems.

Supply and Installation of PV Solar System with total capacity of 364 KWP for Sadaka Hospital and 100KWP for Shifa Hospital

Supply of Wooden Poles Contract#11/2022

Supply of 3,000 Wooden Poles