محطة تحلية بيت لاهيا

  • Category
    محطات تحلية مياه البحر
  • Client
    سلطة المياه الفلسطينية
  • Supervisor
    ديغريمون
  • Funded By
    والوكالة الفرنسية للتنمية
  • Region
    بيت لاهيا
  • From - To
    2000-01-01 00:00:00 - 2001-01-01 00:00:00
  • Value
    570,000.00$

The works include all civil works and electromechanecal installation for the delalinztion plant of capacity of 5000-M3/day
MACC was Sub-Contractor of Dogrement Who was the prime contactor
The project is considered the first SWRO desalination technology in GAZA and Include civil works :Beach well digging , sand filterinstalla RO Building contruction ( steel Structure Building ) ,post treatment of, retaining wall of the whole site -about 7000 m2 area