Design & Construction of Salfeet Wastewater Treatment Plant+ 2 years Operation and Maintenance Service and the Optional Item Small Photovoltaic Power Plant.
-
الفئةدراسات
-
العميلNablus Municipalty
-
جهة الإشرافبلدية سلفيت
-
Funded Byبنك الائتمان لإعادة التنمية KfW
-
المنطقةWestbank
-
From - To2017-07-11 00:00:00 - 2023-03-01 00:00:00
-
Value7,075,188.00$
Design, Construction, Commissioning and two years operation of a wastewater treatment plant. The required hydraulic capacity of the wastewater treatment is to be about 1,900 m3/d (or 20,500 PE).