Construction of Desalinated Water Pipeline in Rafah and Khan Younis
-
CategoryEmergency works 2024–2026
-
ClientOperation Chivalrous Knight 3
-
SupervisorOperation Chivalrous Knight 3
-
Funded By-
-
RegionSouthern Gaza
-
From - To2025-07-24 - 2025-09-10
-
Value1,450,205.00$
Key facts
- Pipe length
- 6,765 m
- Diameters
- 315 mm
- Pipe material
- HDPE
- Storage
- Water tanks at distribution points
Emergency desalinated-water pipeline from the desalination plant in Rafah, Egypt, to the Al Mawasi area of Khan Younis, funded by Operation Chivalrous Knight 3, to give displaced families and residents a reliable source of safe water. MACC excavated and laid 6,765 m of 315 mm HDPE pipe and installed water distribution points with tanks and filling stations.
Scope of work
- Trench excavation along the pipeline route from Rafah to Al Mawasi
- Supply and installation of 6,765 m of 315 mm HDPE water pipeline
- Connection to the desalination plant in Rafah, Egypt
- Water distribution points equipped with water tanks
- Filling stations at the distribution points for families to collect water