Rehabilitation and Maintenance of Part of the Water Network in Gaza City
-
CategoryEmergency works 2024–2026
-
ClientOperation Chivalrous Knight 3
-
SupervisorOperation Chivalrous Knight 3
-
Funded By-
-
RegionGaza City
-
From - To2024-11-26 - 2024-12-26
-
Value118,100.00$
Key facts
- Locations
- Gaza City
- Response
- Emergency repair of a water network
- Items / works
- 1,700 m of UPVC pipe, 110–225 mm, supplied from Egypt
Rehabilitation and maintenance of part of the Gaza City water network during the war, funded by Operation Chivalrous Knight 3. MACC supplied UPVC pipe from Egypt and installed 1,700 m of pipe with diameters from 110 to 225 mm.