Installation of Filling Station at Southern Gaza Desalination Plant

  • Category
    Emergency works 2024–2026
  • Client
    United Nations Children’s Fund (UNICEF)
  • Supervisor
    UNICEF
  • Funded By
    -
  • Region
    Southern Gaza
  • From - To
    2024-12-25 - 2025-05-30
  • Value
    120,000.00ILS

Key facts

Diameters
160 mm and 110 mm HDPE (PN16); 3-inch filling bars
Pumping capacity
Booster pump, 60 m³/h at 20 m head
Works
Three overhead truck filling points on painted mild-steel structures

Installation of a water-truck filling station at the Southern Gaza Desalination Plant for UNICEF under contract 43423578 (24 December 2024 – 31 May 2025). The station lets water trucks load desalinated water directly at the plant for distribution; MACC installed the booster pump, three overhead filling points, connecting HDPE pipework and steel support structures.

Scope of work

  • Installation of a booster pump, 60 m³/h at 20 m head
  • Three overhead truck filling points with reinforced 4-inch filling hoses connected to 3-inch HDPE filling bars
  • All piping between the pumps and the filling points in 160 mm and 110 mm HDPE (PN16)
  • Supply and installation of painted mild-steel support structures for the filling units