Main line maintenance in Abasan and Bani Sohaila

  • Category
    Emergency
  • Client
    PWA
  • Supervisor
    -
  • Funded By
    -
  • Region
    Southern Governorate
  • From - To
    2024-04-16 - 2024-05-16
  • Value
    20,400.00$

Supply and install HDPE DN 300 mm with total length 250 meter and pipe DN 350 mm with total length 250 meter