1. Home
  2. Projects
  3. Emergency works 2024–2026
  4. Main Line Maintenance in Abasan and Bani Suhaila

Main Line Maintenance in Abasan and Bani Suhaila

Main Line Maintenance in Abasan and Bani Suhaila

Key facts

Locations
Abasan and Bani Suhaila
Response
Emergency repair of a water main
Items / works
HDPE DN300, 250 m and DN350, 250 m

Emergency maintenance of the main (force main) line serving Abasan and Bani Suhaila for the Palestinian Water Authority in April 2024. MACC supplied and installed 250 m of DN300 and 250 m of DN350 HDPE pipe.