Maintenance and rehabilitation of pressure line No. 05 in Gaza City

  • Category
    Emergency Works 2024–2026
  • Client
    Arab and International Organization to Construct in Palestine
  • Supervisor
    Arab and International Organization to Construct in Palestine
  • Funded By
    -
  • Region
    Southern Gaza
  • From - To
    2024-12-09 - 2025-01-09
  • Value
    54,998.00$

Supply and installation of 250 mm diameter pipe with a total length of 80 meters and 160 mm pipe with a total length of 30 meters, to replace a damaged pipe, in addition to 100 meters of DN 110 mm pipe for the water line, during the conflict