Strengthening of Skid Steel Mountings

Key facts

Locations
Southern Gaza Desalination Plant, Phase 1
Response
Urgent structural repair at a desalination plant
Items / works
Strengthening of the steel mounting structure of the RO vessel skids and repair of the rainwater gutter

Strengthening of the steel mounting structure that carries the RO vessel skids at Phase 1 of the Southern Gaza Desalination Plant, for UNICEF under contract 43418180. Joint UNICEF–CMWU inspections had found the skid mountings and the rainwater gutter to be the most critical defects; MACC supplied and installed new steel components and replaced the defective parts.

Items supplied

  • Supply and installation of new steel components for the vessel-skid mounting structure
  • Removal and replacement of defective steel parts
  • Replacement or strengthening of the rainwater gutter
  • Provision of all materials and equipment for the works