Key facts
- Quantity
- 6 main distribution boards plus a combined-output panel and a changeover panel
- Items supplied
- Eaton generator distribution and synchronisation panels, earthing systems and generator spare parts
- Destination
- UNICEF
Supply of generator distribution and synchronisation panels with earthing systems and generator spare parts for UNICEF under purchase order 81139640 (21 October 2024). The panels allow groups of generators to run in parallel and share load, and a changeover panel switches between new and existing generator sets.
Items supplied
- 6 Eaton main distribution boards (IP54, 1,600 A breakers with remote operators, copper busbars, power meters, Deep Sea DSE8810 auto-start load-share modules)
- Combined-output panel with Eaton IZMX breakers and SOCOMEC Diris power analyser
- Manual changeover panel with mechanically interlocked breakers between new and existing generator sets
- Two earthing systems per generator set (neutral and frame)
- Spare parts for a Caterpillar 900 kVA generator: lubricant, fuel and air filters, radiator fan and core, belts and voltage regulator
- Spare parts for Kohler generator sets