Key facts
- Works
- Crushing to 0–60 mm aggregate, storage and mixing on site
- Quantity
- 100,000 t of concrete rubble crushed
- Scope
- Transport, crushing, storage and mixing
- Locations
- Rafah
Crushing of 100,000 tonnes of concrete rubble from destroyed buildings into 0–60 mm aggregate for reuse, under UNDP's Debris Management Project in Rafah. Under the eight-month contract MACC handled the rubble from the dumping site through to stockpiles of crushed material.
Scope of work
- Transport of raw concrete rubble from within the crushing and dumping site to the crushers
- Crushing of 100,000 tonnes of concrete rubble to the required sizes (0–60 mm)
- Storage and mixing of the crushed material
- Transport of the mixed crushed material to designated places within the site