Key facts
- Area
- 60,000 m² graded, levelled and compacted
- Quantity
- About 1,100,000 t of settlement debris crushed
- Equipment
- Two crushers of 500 t/h each
Crushing and recycling of the demolition debris left by the evacuated settlements in the Gaza Strip, for UNDP. MACC supplied and erected two 500 t/h crushers, crushed about 1.1 million tonnes of debris, and graded and compacted a 60,000 m² area. An additional order in 2007–2008 covered sand debris at the former Gan-Or settlement.
Scope of work
- Supply and erection of two crushers of 500 t/h capacity each
- Crushing of about 1,100,000 tonnes of settlement demolition debris
- Grading and levelling of a 60,000 m² area
- Spreading, compaction and testing over the 60,000 m² area
- Additional works (16 Oct 2007 – 31 Jan 2008): removal of sand debris from the former Gan-Or settlement
- Set-up of a crushing and dumping site at Gan-Or