Key facts
- Quantity
- Including about 306 km of 18/30 kV 1×630 mm² Al cable and about 207 km of ACSR 150/25 mm² conductor
- Items supplied
- MV and LV XLPE cables, ACSR and copper conductors, wires, steel materials and accessories
- Destination
- PENRA, for the Gaza Strip electricity network
Supply of medium- and low-voltage cables, conductors, wires, steel materials and accessories for the rehabilitation of the Gaza Strip electricity network, for the Palestinian Energy and Natural Resources Authority (PENRA) under the World Bank-funded ASPIRE-II project (contract GZ-PENRA-331716-GO-RFB, Lot 1). Contract signed 20 September 2023; completed in 2025 after six addenda.
Items supplied
- 18/30 kV single-core 1×630/35 mm² Al XLPE cable (about 306 km)
- 12/20 kV single-core XLPE cables, 1×400/35 mm² Al and 1×50/16 mm² Cu
- ACSR conductors (Rabbit, 95/15 and 150/25 mm²) and hard-drawn copper conductor
- 0.6/1 kV LV cables (1×240 mm² Cu; 4×240 mm² Al) and earthing wire
- Steel materials and accessories
- Factory acceptance tests (KEMA) and delivery for the Gaza Strip