Key facts
- Locations
- Shelters (semi-permanent schools and PA shelters) in the south and middle of the Gaza Strip
- Response
- Emergency WASH repairs at displacement shelters
- Items / works
- Sewer repairs and manholes; well drilling and rehabilitation with 3 HP submersible pumps; water tanks and drinking fountains
Emergency repair of sewage systems and water wells serving displacement shelters (semi-permanent schools and shelters) in the southern and middle areas of the Gaza Strip, for UNICEF under contract 43437671 (10 August – 30 December 2025, after Amendment 1). MACC repaired and reconnected shelter sewers, drilled and equipped water wells, and installed water points with tanks and drinking fountains.
Scope of work
- Supply and installation of UPVC SN8 drainage pipe (6-inch, 110 mm and 75 mm) and fittings, including excavation, dewatering and backfilling
- Precast reinforced-concrete manholes (80 cm and 60 cm internal diameter) with cast-iron covers, manhole slabs and replacement covers
- Cleaning of clogged sewer manholes and reconnection of existing pipelines
- Drilling of water wells with steel drilling pipe (not less than 10-inch) and installation of 160 mm PN10 UPVC casing with a 12 m screen
- Well cleaning and pumping tests with water-level and quality measurements
- Supply and installation of 3 HP stainless-steel submersible pumps with control panels and DN50/DN63 HDPE riser hoses
- Water points with 2,000-litre tanks and 5-point drinking fountains
- On-call labour, wheel loader, waste removal and a 15 kVA mobile generator
Technology and key components
- Submersible pumps: 3 HP multistage, AISI 316 pump components, AISI 304 motor (Franklin or equivalent), 2,900 rpm, efficiency not less than 75%
- Pump control panels: galvanised steel, star-delta starter, Eaton overload and breakers, under-voltage relay, Entes water-level sensor