Rehabilitation pf Sheikh Redwan stormwater Pressure Pipeline

  • Category
    Emergency
  • Client
    الهيئة العربية للاعمار
  • Supervisor
    الهيئة العربية للاعمار
  • Funded By
    -
  • Region
    Southern Governorate
  • From - To
    2024-08-25 - 2024-11-15
  • Value
    349,929.00$

Extending two 630 mm diameter pressure lines made of HDPE until reaching the highest point in the street (Al-Shifa Street intersection), the distance is about 350m, constructing an energy breaker manhole at the end point. Excavating a surface drainage channel to drain water from the elevated area to the sea with a length of approximately 1200 m.