إنشاء محطة ضخ رقم 5
-
Categoryمحطات الضخ , التحكم عن بعد
-
Clientالوكالة الأمريكية للتنمية الدولية
-
Supervisorائتلاف ميتكالف و ايدي
-
Funded Byالوكالة الأمريكية للتنمية الدولية
-
RegionGaza City
-
From - To1998-01-01 00:00:00 - 2000-01-01 00:00:00
-
Value3,550,000.00$
MACC was the sub contactor for these two PS projects funded by USAID
The works include construction of new pumping station
(ps5) of 700 m3/hr and ps7 of 2000 m3/hr
MACC Activities Covered for Each Pump
1-construction of pumping station facilities: pump dry wells, screen chamber, grit removal, generator room, transformer room, fuel tank, underground water tank, boundary wall and operation room
2-installation mechanical equipment: dray installed pumps, mechanical racked screen, grit removal, odor system, conveyors, sluice gates, different valves category and installation of firefighting system
3-installation of electrical switch gear, panel boards, frequency converters, internal & external lighting, installation of automation and SCADA systems and installation of fire alarm. security systems. 800 KVA generators, by Switch gear, 2000 KVA transformer with isolators and electrical panels at Gaza
4-Full project quality contract , safety ,environment requirement