إنشاء محطة ضخ رقم 7

  • Category
    محطات الضخ , التحكم عن بعد
  • Client
    الوكالة الأمريكية للتنمية الدولية
  • Supervisor
    ائتلاف ميتكالف و ايدي
  • Funded By
    الوكالة الأمريكية للتنمية الدولية
  • Region
    Gaza City
  • From - To
    1998-01-01 00:00:00 - 2000-01-01 00:00:00
  • Value
    3,550,000.00$

MACC was the sub contactor for these two PS projects funded by USAID

The works include construction of new pumping station

(ps5) of 700 m3/hr and ps7 of 2000 m3/hr

MACC Activities Covered for Each Pump

1-construction of pumping station facilities: pump dry wells, screen chamber, grit removal, generator room, transformer room, fuel tank, underground water tank, boundary wall and operation room

2-installation mechanical equipment: dray installed pumps, mechanical racked screen, grit removal, odor system, con­veyors, sluice gates, different valves category and instal­lation of firefighting system

3-installation of electrical switch gear, panel boards, fre­quency converters, internal & external lighting, installa­tion of automation and SCADA systems and installation of fire alarm. security systems. 800 KVA generators, by Switch gear, 2000 KVA transformer with isolators and electrical panels at Gaza

4-Full project quality contract , safety ,environment requirement