Gaza Central Water and Wastewater Project Contract 4 Buriaji and Sheikh Ajleen WWTPs Solar PVs with 3 years O&M.

  • Category
    DESIGN/BUILD
  • Client
    KFW
  • Supervisor
    CMWU
  • Funded By
    KFW
  • Region
    SOUTHERN GOVERNORATE / DURAJI
  • From - To
    2019-03-23 - 2023-08-20
  • Value
    5,067,231.00$

Design/Built,Supply & installation and 3 years O&M of 4.7 MW PV grid-tied system, distributed in two sites (ALBURIEJ 3.5 MW, SHIEKH AJLEEN 1.2 MW)+synchronization works between the PV system and the already installed two Diesel Generator at each site separately. The surplus power will be sold back to GEDCO.