GCWWP: Gaza Central Wastewater Project, Contract 1: Bureij WWTP & Wadi Gaza CPS

  • Category
    DESIGN/BUILD
  • Client
    CMWU
  • Supervisor
    DORSCH INTERNATIONAL CONSULTANTS GMBH
  • Funded By
    KFW
  • Region
    Bureij
  • From - To
    2016-12-01 - 2020-12-01
  • Value
    44,089,800.00$

THE PROJECT WORKS WILL INCLUDE:
1. Design and construction of the civil engineering structures and building works, including geotechnical survey on the site of the works.
2. Design, manufacture, transport, erection mechanical and electrical equipment. Thereafter testing and commissioning of the facilities as complete functioning Works, all in accordance with the project specification.
3. Operation and Assistance works for two (2) years after commissioning and issuance of the Taking over Certificate.