Gaza Central Water and Wastewater project (Contract 1- Buraij WWTP& Wadi Gaza CPS) with 2 years O&M.

Design/Built WWTP with capacity of 60,000 m3/day and wadi Gaza Central PS with a capacity of 7,000 m3/h. Main works included 2 floor administration building with area of 530 m²/each,400 m² workshop building, 20,988 m² road works, 2 cylindric tanks of 45,000 m³, 1,500 m³ cylindric Gas holder building, 25,000 m³ rectangular storage tanks, 8,000 L.M, piping works & 186,377 Excavation works.

SWRO process plant and the associated works for the second phase expansion of southern Gaza desalination plant (SGDP).

Design and Construction of RO 14,000 m³/day of desalinated water, including main steel structure building with total area of 1,500 m² including all electro- mechanical works, 3 tanks with total capacity of 1,450m³, installation of 3 Km of HDPE piping works and 250 kw PV system.

Supplying Al Shifa medical complex and the Turkish Palestinian Friendship hospital with two solar energy systems.

Supply and Installation of PV Solar System with total capacity of 364 KWP for Sadaka Hospital and 100KWP for Shifa Hospital