1. Home
  2. Projects
  3. Networks and conveyance lines
  4. ER6.2 – Water Network Reconstruction

ER6.2 – Water Network Reconstruction

ER6.2 – Water Network Reconstruction

Key facts

Pipe length
About 22,000 m UPVC; 4,000 m MDPE
Diameters
UPVC 110, 225 and 315 mm; valves up to 16 inch
Pipe material
UPVC and MDPE

Reconstruction of a water network under contract ER6.2, funded by the German Government through KfW for the Coastal Municipalities Water Utility (CMWU) and supervised by Dorsch International Consultants. MACC supplied and installed about 22,000 m of UPVC pipes and 4,000 m of MDPE pipes with fittings, valves and manholes. CMWU certified that the main environmental, social, health and safety measures were carried out in line with international standards.

Scope of work

  • Supply and installation of about 22,000 m of UPVC water pipes of 110, 225 and 315 mm
  • Supply and installation of about 4,000 m of MDPE pipes
  • All fittings and valves, up to 16 inch
  • Manholes and valve chambers
  • Environmental, social, health and safety measures, certified by CMWU