Key facts
- Structure
- Sewage pumping station
- Works
- Pressure sewage line and pumping station
- Scope
- Construction of pumping station and pressure line
- Locations
- Sheikh Radwan basin to the sea
- Purpose
- Conveying basin flows to the sea
A pressure line and pumping station at the downstream end of the Sheikh Radwan basin in Gaza City, built for Gaza Municipality in 1998–1999. The pumping station lifts flows from the basin into a pressure line that runs on a near-straight alignment to the sea.
Scope of work
- Pumping station at the downstream end of the Sheikh Radwan basin
- Pressure line from the pumping station to the sea on a near-straight alignment