Crushing 111,000 Tons of concrete debris into different sizes (from 10 to 80 mm).
1.306 MW PV grid-tied system, synchronization works between the PV system and the already installed 3 Diesel Generator at each site separately, Surplus power will be sold back to GEDCO.