Key facts
- Pipe length
- About 500 m gravity line
- Diameters
- 630 mm
- Pipe material
- UPVC
- Pumping capacity
- 1,200 m³/h
- Works
- Pump station, service building, generator room with 400 kVA standby generator
Construction of the Amer sewage pumping station (contract PWA/Sida/SS.NG.36) for the Palestinian Water Authority, funded by Sida (Sweden). MACC built the 1,200 m³/h station with its civil structures and electromechanical installations, a standby generator and about 500 m of 630 mm UPVC gravity sewer, between January 2011 and April 2012.
Scope of work
- Pump station of 1,200 m³/h with bar screen and wet and dry wells
- Supports for the pressure main inside the pump site
- Service building, generator room and fuel tanks
- 400 kVA standby generator
- Mechanical and electrical works
- About 500 m of 630 mm UPVC gravity line from the collection manhole to the inlet manhole
- About 1,500 m³ of earthworks and 800 m³ of concrete