1. Home
  2. Projects
  3. Pumping stations and controls (SCADA/PLC)
  4. SS.NG.36 – Amer Sewage Pumping Station

SS.NG.36 – Amer Sewage Pumping Station

Key facts

Pipe length
About 500 m gravity line
Diameters
630 mm
Pipe material
UPVC
Pumping capacity
1,200 m³/h
Works
Pump station, service building, generator room with 400 kVA standby generator

Construction of the Amer sewage pumping station (contract PWA/Sida/SS.NG.36) for the Palestinian Water Authority, funded by Sida (Sweden). MACC built the 1,200 m³/h station with its civil structures and electromechanical installations, a standby generator and about 500 m of 630 mm UPVC gravity sewer, between January 2011 and April 2012.

Scope of work

  • Pump station of 1,200 m³/h with bar screen and wet and dry wells
  • Supports for the pressure main inside the pump site
  • Service building, generator room and fuel tanks
  • 400 kVA standby generator
  • Mechanical and electrical works
  • About 500 m of 630 mm UPVC gravity line from the collection manhole to the inlet manhole
  • About 1,500 m³ of earthworks and 800 m³ of concrete