Key facts
- Transformers
- 2,000 kVA transformer with isolators; 800 kVA generators
- Pumping capacity
- PS5: 700 m³/h; PS7: 2,000 m³/h
- Controls
- Automation and SCADA systems; frequency converters
Construction of two new sewage pumping stations in Gaza City, PS5 (700 m³/h) and PS7 (2,000 m³/h), for Gaza Municipality with USAID funding, delivered as one contract in 1998–2000. MACC built each station's facilities and installed its mechanical, electrical, automation and SCADA systems.
Scope of work
- Pump dry wells, screen chamber and grit removal
- Generator room, transformer room, fuel tank and underground water tank
- Boundary wall and operation room
- Dry-installed pumps, mechanically raked screens, grit removal, odour system and conveyors
- Sluice gates, valves and firefighting system
- Electrical switchgear, panel boards, frequency converters, internal and external lighting
- Automation, SCADA, fire alarm and security systems
- 800 kVA generators, HV switchgear and a 2,000 kVA transformer with isolators
Technology and key components
- Dry-installed sewage pumps with frequency converters
- Mechanically raked screens and grit removal with conveyors
- Odour control system
- Automation and SCADA
- 800 kVA standby generators and 2,000 kVA transformer