  4. Construction of Pumping Stations No. 5 and No. 7, Gaza City

Construction of Pumping Stations No. 5 and No. 7, Gaza City

Key facts

Transformers
2,000 kVA transformer with isolators; 800 kVA generators
Pumping capacity
PS5: 700 m³/h; PS7: 2,000 m³/h
Controls
Automation and SCADA systems; frequency converters

Construction of two new sewage pumping stations in Gaza City, PS5 (700 m³/h) and PS7 (2,000 m³/h), for Gaza Municipality with USAID funding, delivered as one contract in 1998–2000. MACC built each station's facilities and installed its mechanical, electrical, automation and SCADA systems.

Scope of work

  • Pump dry wells, screen chamber and grit removal
  • Generator room, transformer room, fuel tank and underground water tank
  • Boundary wall and operation room
  • Dry-installed pumps, mechanically raked screens, grit removal, odour system and conveyors
  • Sluice gates, valves and firefighting system
  • Electrical switchgear, panel boards, frequency converters, internal and external lighting
  • Automation, SCADA, fire alarm and security systems
  • 800 kVA generators, HV switchgear and a 2,000 kVA transformer with isolators

Technology and key components

  • Dry-installed sewage pumps with frequency converters
  • Mechanically raked screens and grit removal with conveyors
  • Odour control system
  • Automation and SCADA
  • 800 kVA standby generators and 2,000 kVA transformer