Improve the Functionality of Damaged Water and Wastewater Networks

Improve the Functionality of Damaged Water and Wastewater Networks

Key facts

Pipe length
About 11,560 m in total (220.5 m RC; 2,979 m UPVC sewer; 2,362.5 m UPVC water; 6,000 m MDPE)
Diameters
110–1,250 mm
Pipe material
Reinforced concrete, UPVC (SN8 sewer), MDPE

Rehabilitation of damaged water and wastewater networks in Khan Younis and its eastern villages, and separation of the stormwater and wastewater networks at Al Junaina in Rafah and Al Amal in Khan Younis. The works were funded by the European Union. MACC laid reinforced-concrete, UPVC and MDPE pipelines with all fittings, valves and manholes.

Scope of work

  • Rehabilitation and upgrading of water networks in Khan Younis and the Eastern Villages
  • Separation of stormwater and wastewater networks at Al Junaina (Rafah) and Al Amal (Khan Younis)
  • Supply and installation of about 220.5 m of 1,250 mm reinforced-concrete gravity pipes
  • Supply and installation of 2,979 m of UPVC SN8 gravity sewer pipes of 160, 200 and 400 mm
  • Supply and installation of 2,362.5 m of 110 mm UPVC water pipes and 6,000 m of MDPE pipes
  • All needed fittings, valves and manholes