Key facts
- Transformers
- Two 900 kVA standby generators
- Pumping capacity
- Five pumps (four duty, one standby), 3,240 m³/h at 6.2 bar (design 3,600 m³/h)
- Controls
- SCADA
- Works
- Deep wet and dry pits, screening and odour treatment
Construction of the Terminal Sewage Pump Station (NGEST-NCB-01-04) at the existing Beit Lahia treatment site under the World Bank-funded North Gaza Emergency Sewage Treatment (NGEST) project, for the Palestinian Water Authority, with MACC. The station transfers the wastewater of Jabalia, Beit Lahia and Beit Hanoun to the North Gaza Wastewater Treatment Plant.
Scope of work
- Civil buildings of the pump station: deep wet and dry pits and a light superstructure
- Supply and installation of five sewage pumps (four duty, one standby)
- Screening system
- Odour treatment
- Two 900 kVA standby generators
- SCADA and electromechanical installations
Technology and key components
- Five pumps delivering 3,240 m³/h at 6.2 bar into the pressure line to the new WWTP
- Screening and odour treatment at the station inlet
- SCADA monitoring and control
- 2 × 900 kVA standby generators