Sheikh Hamad City Sewage Pump Station and Carrier Line (QF/B-C/64/2015, Package 11)

Sheikh Hamad City Sewage Pump Station and Carrier Line (QF/B-C/64/2015, Package 11)

Key facts

Pipe length
About 1 km force main; 1,840 m gravity sewer
Diameters
DN400 PN12.5 (force main); DN510–630 (gravity)
Pipe material
UPVC (gravity sewer)
Pumping capacity
3 submersible pumps (2 duty + 1 standby), 192 l/s each at 14.5 m head

A new sewage pumping station and carrier line serving Sheikh Hamad bin Khalifa City in Khan Younis, funded by the State of Qatar through the Gaza Reconstruction Committee, with Khan Younis Municipality as beneficiary. MACC built the station with its buildings, mechanical and electrical systems, a DN400 force main of about 1 km to an energy-breaker manhole, and 1,840 m of UPVC gravity sewer from the city.

Scope of work

  • Inlet manhole, bar-screen chamber with a mechanically raked screen, and wet well
  • Pump house with three submersible pumps (two duty, one standby) and flow meters
  • Control room and switchboard, with electrical supply, distribution, control, lighting and instrumentation
  • Standby generator room with two 165 kVA generators and fuel tank
  • Administration building with office, workshop, toilets and store
  • Ventilation, odour removal, firefighting system and crane girders for maintenance
  • DN400 PN12.5 force main of about 1 km from the station to an energy-breaker manhole
  • 1,840 m of UPVC gravity sewer, DN510–630, from Sheikh Hamad City to the station

Technology and key components

  • Submersible pumps rated 192 l/s at 14.5 m head, 22 kW each
  • Removable mechanically raked vertical screen, 216 l/s total capacity, maximum head loss 60 mm
  • Two 165 kVA standby diesel generators