Key facts
- Pumping capacity
- New bar screens, pumps, manifolds and air-release valves
- Works
- Upgrading of pump stations PS1, PS2 and PS3
- Scope
- Civil rehabilitation and electromechanical upgrading
- Locations
- Beit Hanoun, North Gaza
Upgrading and maintenance of the three Beit Hanoun sewage pump stations (PS1, PS2 and PS3) for the Coastal Municipalities Water Utility (CMWU), funded by the ICRC under contract CMWU-ICRC 02/2011. MACC upgraded the electromechanical equipment and rehabilitated the civil structures between June 2011 and April 2012.
Scope of work
- Site clearing, grubbing and removal of debris
- Excavation, levelling, trenching and backfilling, with sheeting and shoring
- Subgrade preparation, pumping and dewatering
- Supply and installation of bar screens and pumps
- Manifolds and air-release valves
- Rehabilitation of the civil structures of PS1, PS2 and PS3