Main line maintenance in Abasan and Bani Sohaila
-
CategoryEmergency
-
ClientPWA
-
Supervisor-
-
Funded By-
-
RegionSouthern Governorate
-
From - To2024-04-16 - 2024-05-16
-
Value20,400.00$
Supply and install HDPE DN 300 mm with total length 250 meter and pipe DN 350 mm with total length 250 meter