NGEST – Terminal Sewage Pump Station (NGEST-NCB-01-04)
-
CategoryPumping Stations and Controls (SCADA/PLC)
-
ClientPalestinian Water Authority (PWA)
-
Supervisor
-
Funded ByWorld Bank
-
RegionBeit Lahia, North Gaza
-
From - To2009-01-01 - 2010-06-30
-
Value3,769,535.00$
Construction of the Terminal Sewage Pump Station at the existing Beit Lahia treatment site under the World Bank-funded NGEST project, for the Palestinian Water Authority, with MACC as main contractor. The station transfers the sewage of Jabalia, Beit Lahia and Beit Hanoun to the new North Gaza Wastewater Treatment Plant and has been operated by CMWU since 2010.
- Pump station of about 3,600 m³/h with five pumps (four duty, one standby) delivering 3,240 m³/h at 6.2 bar
- Screening, odour treatment and SCADA
- Two 900 kVA standby generators